钢材监装——仅建议对成品钢货物

Views : 736
Author : The Gard P&I Club
Update time : 2024-12-13 11:28:11


Gard
承担本协会互保会员发生的钢材装前检验费用(须事先扣除承租人分担的份额),但只有成品钢货物的装前检验费用才能获得给付。本文将对建议进行装前检验的货物种类进行概括说明。

作为一般指导原则,本协会将承担入会船东发生的成品钢货物装前检验费用。据此,通常建议对下列货物进行装前检验:

Ÿ   成卷或成捆热轧钢

Ÿ   成卷、成包或成捆冷轧钢

Ÿ   镀锌钢

Ÿ   不锈钢

Ÿ   镀锡铁板

Ÿ   线材

Ÿ   钢管

Ÿ   结构钢(钢筋、槽钢、角钢、钢梁、条钢、带钢、型钢、钢锻件)






Pre-load Steel Surveys —— Recommended Only For Finished Steel Products

 

For our mutual Members, Gard covers the cost of pre-load steel surveys (after any contribution from charterers). Only finished steel cargos justify the costs. We outline in this article the type of cargo that is covered by the pre-load recommendation.

 

As a general guideline, the Club will cover the costs involved in owners entries pre-loading survey on finished steel products. Accordingly, it is normally recommended that pre-loading surveys be carried out on the following products:

 

Ÿ   Hot rolled steel in coils or bundles

Ÿ   Cold rolled steel in coils, packs or bundles

Ÿ   Galvanized steel

Ÿ   Stainless steel

Ÿ   Tin plates

Ÿ   Wire rods

Ÿ   Steel pipes

Ÿ   Structural steel (rebars, channels, angles, beams, bars, strips, sections, forgings)

 

However, certain low-value and semi-finished products, such as those listed below, normally do not require a pre-loading survey because these products must be processed further before use:

 

Ÿ   Steel billets

Ÿ   Steel blooms

Ÿ   Steel slabs

Ÿ   Steel scrap

Ÿ   Steel swarf

Ÿ   Pig iron

Nevertheless, if despite the Clubs recommendation a member wishes to have a pre-loading survey of any of the above low-value and semi-finished steel products carried out, the Club may assist with the arrangements, but the costs of the survey will be for the members own account.

 

It should be noted that the mere failure to carry out a pre-loading survey on finished steel products does not prejudice the P&I cover. However, P&I cover may be prejudiced if the master or the member knows that the bill of lading, waybill or other document evidencing the contract of carriage contains an incorrect description of the cargo or its quantity or its condition. Consignees/receivers of cargo are entitled to rely on the description in the bill of lading and may claim for damage or shortage based on description of the order and condition as stated in the bill of lading.

 

Finally, there are occasions when it makes sense for an owner to agree with a time charterer to share the costs of a pre-loading survey on a 50/50 basis. Generally, the Club does not have a problem with this, and it may be a good solution from a cost perspective if there is a sound on-going commercial relationship between owners and charterers. However, it is appropriate to warn owners against agreeing to share the costs of a pre-loading survey with voyage charterers for the obvious reason that voyage charterers will quite frequently have a very close commercial relationship with the shippers, with the result that disputes over remarks in mates receipts and clausing of bills of lading can easily occur.



Source: Gard